Transparency · Major projects

The government’s biggest projects, year by year

The Government Major Projects Portfolio is the list of the largest and riskiest projects departments run. Each March the departments report every project’s whole-life cost, its end date and a delivery confidence rating of Red, Amber or Green, and the government’s projects authority (the IPA until 2025, now NISTA) publishes them.

From March 2026 costs are in 2024/25 prices. The reports for March 2024 and March 2025 do not say what price basis their costs use, and some departments used their own (HS2’s costs were in 2019 prices), so each year’s cost is shown with its basis and costs are not compared between years.

261 projects since March 2024 · 189 in the March 2026 report

CO · 11

Department page: Cabinet Office

  1. Falcon Programme · Amber (the department's own assessment) · End date: 31 December 2026
  2. Future Service Programme · Exempt under Section 43 - Commercial interests · End date: 31 December 2026
  3. Manchester Digital Campus · Amber (NISTA's independent assessment) · End date: 17 December 2032
  4. Transforming Public Procurement · Green (the department's own assessment) · End date: 31 March 2026
  5. ATS Transformation · Amber (the department's own assessment) · End date: 30 September 2027 · Last reported March 2025
  6. Civil Service Pensions 2015 Remedy · Red (the department's own assessment) · End date: 30 June 2024 · Last reported March 2025
  7. Government Hubs and Whitehall Campus Programme · Amber (the department's own assessment) · End date: 31 March 2030 · Last reported March 2025
  8. Learning Frameworks 2.0 · Green (the department's own assessment) · End date: 1 October 2026 · Last reported March 2024
  9. ROSA RENEWAL PROJECT · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025
  10. Vetting Transformation Programme · Red (NISTA's independent assessment) · End date: 31 March 2023 · Last reported March 2024
  11. WORKPLACE SERVICES TRANSFORMATION PROGRAMME · Amber (the department's own assessment) · End date: Low: 31/03/2025, Mid: 30/04/2025, High: 31/05/2025 · Last reported March 2025

DBT · 4

Department page: Department for Business, Innovation, Science and Trade

  1. AUTOMOTIVE TRANSFORMATION FUND (ATF) · Green (the department's own assessment) · End date: Not given
  2. Drive 35 · Green (the department's own assessment) · End date: 30 April 2030
  3. POST OFFICE - TRANSFORMATION · Amber (NISTA's independent assessment) · End date: Low: 31/03/2030, Mid: 31/03/2032, High: 31/03/2031
  4. Strategic Sites Accelerator (SSA) · Amber (NISTA's independent assessment) · End date: Low: 30/03/2030, Mid: 30/03/2030

DCMS · 6

Department page: Department for Digital, Culture, Media and Sport

  1. 4th National Lottery Licence · Amber (NISTA's independent assessment) · End date: 31 May 2026
  2. British Museum - Energy Centre Programme (ECP) · Green (the department's own assessment) · End date: 31 December 2029
  3. EURO 2028 · Amber (NISTA's independent assessment) · End date: Low: 31/03/2031, Mid: 31/03/2031
  4. Natural History Museum Unlocked · Amber (the department's own assessment) · End date: Low: 30/09/2031, Mid: 30/09/2031, High: 30/09/2031
  5. Youth Investment Fund · Amber (the department's own assessment) · End date: Mid: 31/03/2028, High: 31/03/2028
  6. Blythe House Programme · Amber (the department's own assessment) · End date: 28 June 2024 · Last reported March 2024

DEFRA · 14

Department page: Department for Environment, Food & Rural Affairs

  1. Cefas Infrastructure to Support Future Delivery at Sea · Amber (the department's own assessment) · End date: Low: 31/03/2032, High: 31/12/2031
  2. COLLECTIONS, PACKAGING AND REFORMS PROGRAMME · Amber (NISTA's independent assessment) · End date: 1 June 2028
  3. EU Delivery Programme · Amber (NISTA's independent assessment) · End date: Low: 28/09/2028, High: 28/09/2028
  4. FARMING AND COUNTRYSIDE PROGRAMME · Red (NISTA's independent assessment) · End date: 31 December 2028
  5. FLOOD AND COASTAL EROSION RISK MANAGEMENT · Green (NISTA's independent assessment) · End date: 31 March 2026
  6. Flood and Coastal Risk Management (FCRM) Investment Programme 2026-2029 · Amber (NISTA's independent assessment) · End date: 31 March 2029
  7. Livestock Information Transformation Programme · Red (NISTA's independent assessment) · End date: Low: 31/03/2029, Mid: 31/03/2029, High: 31/03/2030
  8. National Biosecurity Centre (Weybridge) · Green (NISTA's independent assessment) · End date: 30 September 2036
  9. NATURE FOR CLIMATE FUND · Amber (NISTA's independent assessment) · End date: Low: 31/03/2026, Mid: 31/03/2025, High: 31/03/2026
  10. NO2 PROGRAMME · Amber (the department's own assessment) · End date: 31 March 2026
  11. NORTHERN IRELAND · Green (the department's own assessment) · End date: 11 February 2026
  12. TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT · Amber (the department's own assessment) · End date: 31 March 2029
  13. BIOSECURITY, BORDERS AND TRADE PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2025
  14. Workplace and Facilities Management · Green (the department's own assessment) · End date: 31 October 2024 · Last reported March 2024

DESNZ · 25

Department page: Department for Energy Security and Net Zero

  1. BEPPS2 · Amber (the department's own assessment) · End date: 30 June 2035
  2. Boiler Upgrade Scheme · Amber (the department's own assessment) · End date: 31 March 2030
  3. East Coast Cluster (ECC) · Exempt under Section 43 - Commercial interests · End date: Exempt under Section 43 - Commercial interests
  4. GBE-N SMR Programme · Exempt under Section 43 - Commercial interests · End date: Exempt under Section 43 - Commercial interests
  5. GEOLOGICAL DISPOSAL FACILITY · Red (NISTA's independent assessment) · End date: Low: 31/01/2050, Mid: 31/03/2050, High: 31/03/2060
  6. Great British Energy · Amber (NISTA's independent assessment) · End date: 30 October 2026
  7. GREEN HEAT NETWORK FUND · Green (the department's own assessment) · End date: 29 March 2030
  8. Hydrogen Allocation Round 1 (HAR1) · Amber (the department's own assessment) · End date: 30 June 2042
  9. Hydrogen Allocation Round 2 (HAR2) · Red (NISTA's independent assessment) · End date: 31 December 2041
  10. HyNet Cluster · Exempt under Section 43 - Commercial interests · End date: Exempt under Section 43 - Commercial interests
  11. PUBLIC SECTOR DECARBONISATION SCHEME · Amber (the department's own assessment) · End date: 31 March 2028
  12. Review of Electricity Market Arrangements (REMA) · Green (the department's own assessment) · End date: 30 April 2026
  13. SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT · Amber (the department's own assessment) · End date: 24 June 2031
  14. SIXEP CONTINUITY PLANT · Green (the department's own assessment) · End date: 21 October 2031
  15. Sizewell C Project · Exempt under Section 43 - Commercial interests · End date: Exempt under Section 43 - Commercial interests
  16. Smart Metering Implementation Programme · Amber (the department's own assessment) · End date: 31 December 2030
  17. SOCIAL HOUSING DECARBONISATION FUND · Amber (NISTA's independent assessment) · End date: 31 March 2030
  18. Spherical Tokamak for Energy Production · Amber (NISTA's independent assessment) · End date: 1 April 2045
  19. Warm Homes Agency · Red (NISTA's independent assessment) · End date: 31 December 2027
  20. Warm Homes: Local Grant · Amber (NISTA's independent assessment) · End date: 1 September 2028
  21. CCUS · Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. · End date: 31 December 2030 · Last reported March 2024
  22. Home Upgrade Grant and Local Authority Delivery (HULA) schemes · Amber (NISTA's independent assessment) · End date: 1 September 2025 · Last reported March 2025
  23. LOW COST NUCLEAR PROGRAMME (ROLLS ROYCE SMRS CHALLENGE) · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025
  24. NZHF · Amber (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2024
  25. REPLACEMENT ANALYTICAL PROJECT · Red (NISTA's independent assessment) · End date: 30 October 2032 · Last reported March 2025

DFE · 14

Department page: Department for Education

  1. Children's Homes Capital Programme · Amber (the department's own assessment) · End date: Low: 31/03/2030, Mid: 31/03/2031, High: 31/03/2031
  2. Early Years Childcare Reform Programme · Green (NISTA's independent assessment) · End date: Low: 16/03/2023, Mid: 01/12/2028, High: 01/12/2028
  3. Families First Partnership Programme · Amber (the department's own assessment) · End date: 31 March 2029
  4. FE Capital Transformation · Amber (the department's own assessment) · End date: 30 September 2029
  5. Free Breakfast Clubs · Exempt under Section 35 - Formulation of government policy · End date: Exempt under Section 35 - Formulation of government policy
  6. Lifelong Learning Entitlement · Amber (the department's own assessment) · End date: Low: 31/03/2027, Mid: 31/03/2027, High: 31/03/2036
  7. School Rebuilding Programme · Amber (the department's own assessment) · End date: Exempt under Section 22 - Information intended for future publication
  8. School-based nurseries · Amber (the department's own assessment) · End date: 28 September 2029
  9. T-Levels · Amber (the department's own assessment) · End date: 1 September 2028
  10. HIGHER TECHNICAL EDUCATION · Amber (the department's own assessment) · End date: Low: 30/05/2025, Mid: 30/05/2025, High: 30/05/2025 · Last reported March 2025
  11. Initial Teacher Training Market Review (ITT) · Green (the department's own assessment) · End date: 30 September 2024 · Last reported March 2024
  12. Institutes of Technology (IoT) 2 · Amber (the department's own assessment) · End date: 31 March 2025 · Last reported March 2024
  13. NATIONAL TUTORING PROGRAMME · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025
  14. TEACHER DEVELOPMENT REFORM PROGRAMME · Green (the department's own assessment) · End date: Low: 31/07/2025, Mid: 12/02/2026 · Last reported March 2025

DFT · 22

Department page: Department for Transport

  1. 2ND GENERATION UK SEARCH AND RESCUE AVIATION · Green (the department's own assessment) · End date: 1 January 2027
  2. A417 AIR BALLOON · Green (the department's own assessment) · End date: 31 August 2027
  3. A428 BLACK CAT TO CAXTON GIBBET · Green (the department's own assessment) · End date: Exempt under Section 43 - Commercial interests
  4. A66 Northern Trans-Pennine · Amber (the department's own assessment) · End date: 1 November 2026
  5. EAST COAST DIGITAL PROGRAMME · Red (NISTA's independent assessment) · End date: 14 October 2030
  6. EAST COAST MAINLINE PROGRAMME · Red (the department's own assessment) · End date: 3 May 2027
  7. EAST WEST RAIL CONNECTION STATE 1 · Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy · End date: Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests
  8. EAST WEST RAIL CONNECTION STATE 2 AND 3 · Amber (the department's own assessment) · End date: 31 December 2037
  9. HS2 PHASE I · Red (NISTA's independent assessment) · End date: The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information
  10. LOWER THAMES CROSSING · Amber (NISTA's independent assessment) · End date: 31 July 2035
  11. MIDLANDS RAIL HUB · Amber (the department's own assessment) · End date: 31 December 2040
  12. NORTHERN POWERHOUSE RAIL · Amber (NISTA's independent assessment) · End date: 31 December 2051
  13. PUBLIC OWNERSHIP TRANSITION PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 December 2027
  14. Rail Reform: Stand-Up of GBR · Red (NISTA's independent assessment) · End date: Exempt under Section 22 - Information intended for future publication, The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information
  15. REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS) · Exempt under Section 35 - Formulation of government policy · End date: Exempt under Section 35 - Formulation of government policy
  16. TRANSPENNINE ROUTE UPGRADE · Amber (the department's own assessment) · End date: 17 October 2041
  17. A12 CHELMSFORD TO A120 WIDENING · Amber (the department's own assessment) · End date: Section 22 - Information intended for future publication · Last reported March 2025
  18. A303 Amesbury to Berwick Down · Amber (NISTA's independent assessment) · End date: ARMP adjustments - Project not yet in a position to give cost/schedule · Last reported March 2024
  19. Midland Main Line Electrification (MMLE) Programme · Amber (the department's own assessment) · End date: 31 December 2032 · Last reported March 2025
  20. Midland Main Line Programme · Green (the department's own assessment) · End date: 31 December 2024 · Last reported March 2024
  21. RAIL SECTOR TRANSFORMATION PROGRAMME · Amber (NISTA's independent assessment) · End date: The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information · Last reported March 2025
  22. RAPID CHARGING FUND · Section 22 - Information intended for future publication · End date: 30 April 2028 · Last reported March 2025

DHSC · 11

Department page: Department of Health and Social Care

  1. FEDERATED DATA PLATFORM · Green (the department's own assessment) · End date: 31 March 2032
  2. FRONTLINE DIGITISATION · Amber (NISTA's independent assessment) · End date: 31 March 2026
  3. Future NHS Workforce Solution Transformation Programme · Amber (the department's own assessment) · End date: 28 February 2031
  4. INTEGRATED SINGLE FINANCIAL ENVIRONMENT · Green (NISTA's independent assessment) · End date: 31 March 2026
  5. MODERNA STRATEGIC PARTNERSHIP PROGRAMME · Exempt under Section 43 - Commercial interests · End date: Exempt under Section 43 - Commercial interests
  6. NEW HOSPITAL PROGRAMME · Amber (NISTA's independent assessment) · End date: 5 April 2046
  7. NHS Digital Transformation of Screening · Amber (the department's own assessment) · End date: 30 March 2033
  8. UK Health Security Campus · Exempt under Section 35 - Formulation of government policy · End date: Exempt under Section 35 - Formulation of government policy
  9. AI Labs · Amber (the department's own assessment) · End date: 31 March 2024 · Last reported March 2024
  10. DATA FOR RESEARCH AND DEVELOPMENT (R&D) · Amber (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025
  11. DIGITISING SOCIAL CARE · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025

DSIT · 7

  1. GOV.UK One Login · Amber (NISTA's independent assessment) · End date: 31 March 2028
  2. MATRIX CLUSTER TRANSFORMATION PROGRAMME · Red (the department's own assessment) · End date: 27 November 2027
  3. Met Office Supercomputer Programme · Amber (the department's own assessment) · End date: 11 July 2032
  4. Project Gigabit · Amber (the department's own assessment) · End date: 31 December 2032
  5. Shared Rural Network · Green (the department's own assessment) · End date: 11 February 2041
  6. National Underground Asset Register (NUAR) · Amber (the department's own assessment) · End date: 31 March 2026 · Last reported March 2025
  7. Open Networks Programme · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025

DWP · 9

Department page: Department for Work and Pensions

  1. Connect to Work · Green (NISTA's independent assessment) · End date: 31 March 2026
  2. Health Transformation Programme · Amber (NISTA's independent assessment) · End date: 28 September 2029
  3. PENSIONS DASHBOARD PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 March 2027
  4. SERVICE MODERNISATION PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 March 2033
  5. Skills Bootcamps · Amber (the department's own assessment) · End date: Low: 31/03/2026, Mid: 29/05/2026, High: 31/05/2026
  6. SYNERGY PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 January 2029
  7. Workplace Transformation · Amber (NISTA's independent assessment) · End date: 31 March 2031
  8. BUILDING SAFETY REGULATOR · Green (NISTA's independent assessment) · End date: Low: 31/03/2025, Mid: 31/03/2025, High: 31/03/2025 · Last reported March 2025
  9. CONTINUING THE MOVE TO UNIVERSAL CREDIT · Green (NISTA's independent assessment) · End date: Low: 31/03/2025, Mid: 31/03/2025, High: 31/03/2025 · Last reported March 2025

FCDO · 3

Department page: Foreign, Commonwealth & Development Office

  1. TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT · Amber (the department's own assessment) · End date: Low: 01/09/2031, Mid: 01/12/2031, High: 03/05/2032
  2. ECHO 2 PROGRAMME · Green (the department's own assessment) · End date: Low: 05/03/2025, Mid: 05/03/2025, High: 05/03/2025 · Last reported March 2025
  3. Washington Embassy Refurbishment · Green (the department's own assessment) · End date: 30 September 2024 · Last reported March 2024

HMLR · 1

  1. LOCAL LAND CHARGES (LLC) PROGRAMME · Amber (the department's own assessment) · End date: 29 December 2028

HMRC (reports to the Treasury) · 15

Department page: HM Treasury

  1. BUILDING OUR FUTURE LOCATIONS PROGRAMME · Green (the department's own assessment) · End date: 5 April 2031
  2. Contact Centre as a Service (CCaaS) · Amber (NISTA's independent assessment) · End date: 29 October 2027
  3. Enterprise Customer Relationship Management (eCRM) · Amber (NISTA's independent assessment) · End date: 29 March 2030
  4. ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP) · Amber (the department's own assessment) · End date: 31 May 2030
  5. HMRC NORTHERN IRELAND DELIVERY PROGRAMME · Amber (the department's own assessment) · End date: 31 March 2027
  6. MAKING TAX DIGITAL · Amber (NISTA's independent assessment) · End date: 31 March 2029
  7. UNITY PROGRAMME · Red (NISTA's independent assessment) · End date: 30 April 2028
  8. Pensions Programme · Amber (NISTA's independent assessment) · End date: 31 March 2028 · Last reported March 2024
  9. Protect Connect · Amber (the department's own assessment) · End date: 4 September 2023 · Last reported March 2024
  10. Single Customer Account · Green (NISTA's independent assessment) · End date: 30 June 2025 · Last reported March 2024
  11. SINGLE CUSTOMS PLATFORM · Amber (NISTA's independent assessment) · End date: 31 March 2027 · Last reported March 2025
  12. Single Trade Window Programme · Amber (NISTA's independent assessment) · End date: 31 March 2027 · Last reported March 2024
  13. Technical Health Programme · Amber (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2024
  14. TRADER SUPPORT SERVICE · Green (the department's own assessment) · End date: 30 June 2025 · Last reported March 2025
  15. Unique Customer Record · Amber (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2024

HM Treasury · 1

Department page: HM Treasury

  1. NS&I Transformation · Red (NISTA's independent assessment) · End date: Exempt under Section 43 - Commercial interests

HO · 24

Department page: Home Office

  1. ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR) · Amber (the department's own assessment) · End date: Low: 30/09/2027, Mid: 30/09/2027, High: 30/09/2027
  2. ASYLUM ACCOMMODATION PROGRAMME (AAP) · Red (NISTA's independent assessment) · End date: Low: 31/03/2027, Mid: 31/03/2027
  3. Asylum Support Accommodation Programme · Red (NISTA's independent assessment) · End date: 21 December 2029
  4. ASYLUM TRANSFORMATION PROGRAMME · Amber (NISTA's independent assessment) · End date: Low: 31/03/2027, Mid: 31/03/2027, High: 31/03/2027
  5. Cerberus · Amber (the department's own assessment) · End date: 31 March 2030
  6. Civil Registration Service Transformation (CReST) · Amber (the department's own assessment) · End date: 15 August 2030
  7. EMERGENCY SERVICES MOBILE COMMUNICATIONS · Amber (NISTA's independent assessment) · End date: Low: 01/02/2030, Mid: 30/11/2030, High: 30/11/2030
  8. FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE · Green (the department's own assessment) · End date: Low: 18/06/2026, Mid: 18/06/2026
  9. FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS) · Amber (NISTA's independent assessment) · End date: 31 March 2027
  10. HOME OFFICE BIOMETRICS (HOB) PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 December 2026
  11. Immigration Removal Centre (IRC) Expansion Programme · Amber (the department's own assessment) · End date: 14 March 2031
  12. Law Enforcement Data Service · Amber (NISTA's independent assessment) · End date: 31 December 2026
  13. MARITIME CAPABILITIES REPLACEMENT PROGRAMME · The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information · End date: The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information
  14. NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP) · Amber (the department's own assessment) · End date: 30 March 2030
  15. Police National Database (PND) · Amber (NISTA's independent assessment) · End date: Low: 01/07/2027, Mid: 27/10/2027, High: 29/10/2027
  16. RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP) · Exempt under Section 24 - National security · End date: Exempt under Section 24 - National security
  17. Digital Services at the Border (DSAB) · Amber (NISTA's independent assessment) · End date: 30 September 2023 · Last reported March 2024
  18. Fraud Reform · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2025
  19. FUTURE SUPPLIERS SERVICES · Green (the department's own assessment) · End date: 30 May 2025 · Last reported March 2025
  20. IMMIGRATION PLATFORM TECHNOLOGIES (IPT) · Amber (the department's own assessment) · End date: Mid: 15/05/2025, High: 15/05/2025 · Last reported March 2025
  21. MANSTON TRANSFORMATION PROGRAMME · Amber (NISTA's independent assessment) · End date: 31 March 2029 · Last reported March 2025
  22. New Plan for Immigration · Red (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2024
  23. PASSPORT TRANSFORMATION PROGRAMME · Amber (the department's own assessment) · End date: Low: 31/07/2025, Mid: 31/07/2025, High: 31/07/2025 · Last reported March 2025
  24. Targeted Interception Services Programme · Exempt under Section 31 (1) of the Freedom of Information Act 2000 (Law enforcement) · End date: Exempt under Section 31 (1) of the Freedom of Information Act 2000 (Law enforcement) · Last reported March 2024

MHCLG · 12

Department page: Ministry of Housing, Communities and Local Government

  1. Affordable Homes Programme (AHP) · Amber (NISTA's independent assessment) · End date: 31 March 2030
  2. Brownfield, Infrastructure & Land (BIL) · Green (the department's own assessment) · End date: 31 March 2031
  3. DIGITAL PLANNING PROGRAMME · Amber (NISTA's independent assessment) · End date: Mid: 29/03/2030, High: 31/03/2030
  4. Freeports · Amber (the department's own assessment) · End date: 5 April 2030
  5. GRENFELL SITE AND PROGRAMME · Amber (the department's own assessment) · End date: Low: 30/09/2030, Mid: 30/04/2031, High: 31/03/2031
  6. HOUSING INFRASTRUCTURE FUND · Amber (the department's own assessment) · End date: 31 March 2028
  7. Levelling Up Home Building Fund · Green (the department's own assessment) · End date: 31 March 2032
  8. Remediation Portfolio · Red (NISTA's independent assessment) · End date: 31 March 2036
  9. UK HOLOCAUST MEMORIAL AND LEARNING CENTRE · Red (the department's own assessment) · End date: Exempt under Section 35 - Formulation of government policy
  10. ELECTORAL INTEGRITY PROGRAMME · Green (NISTA's independent assessment) · End date: Low: 31/03/2025, Mid: 31/03/2025, High: 31/03/2025 · Last reported March 2025
  11. Levelling Up Fund · Amber (the department's own assessment) · End date: 31 March 2028 · Last reported March 2025
  12. Towns Fund · Amber (the department's own assessment) · End date: Mid: 30/03/2026, High: 31/03/2027 · Last reported March 2025

MOD · 51

Department page: Ministry of Defence

  1. ARMED FORCES RECRUITING PROGRAMME · Amber (the department's own assessment) · End date: 30 April 2028
  2. ARMOUR MBT 2025 · Red (NISTA's independent assessment) · End date: 11 October 2032
  3. ARMOURED CAVALRY 2025 · Red (NISTA's independent assessment) · End date: 31 March 2030
  4. ASTUTE BOATS 1-7 · Amber (the department's own assessment) · End date: Exempt under Section 24 - National security
  5. BRIMSTONE 3 · Amber (the department's own assessment) · End date: 31 January 2031
  6. CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP) · Amber (the department's own assessment) · End date: 31 October 2030
  7. CLYDE INFRASTRUCTURE · Amber (NISTA's independent assessment) · End date: 1 April 2032
  8. COLLECTIVE TRAINING TRANSFORMATION PROGRAMME · Amber (NISTA's independent assessment) · End date: 10 June 2040
  9. CORE PRODUCTION CAPABILITY · Amber (NISTA's independent assessment) · End date: 31 December 2043
  10. DEFENCE ESTATE OPTIMISATION · Amber (the department's own assessment) · End date: 31 March 2041
  11. DREADNOUGHT · Exempt under Section 24 - National security · End date: Exempt under Section 24 - National security
  12. E7 WEDGETAIL · Red (the department's own assessment) · End date: 1 July 2030
  13. EUROPEAN COMMON RADAR SYSTEM MK 2 · Amber (the department's own assessment) · End date: 31 December 2034
  14. FLEET SOLID SUPPORT · Amber (the department's own assessment) · End date: 28 July 2033
  15. FUTURE AIR DOMINANCE SYSTEM · Red (NISTA's independent assessment) · End date: 3 August 2045
  16. FUTURE COMBAT AIR SYSTEM · Red (NISTA's independent assessment) · End date: Exempt under Section 22 - Information intended for future publication
  17. FUTURE CRUISE ANTI SHIP WEAPON (FCASW) · Amber (the department's own assessment) · End date: 1 March 2070
  18. Future Materials Campus · Exempt under Section 24 - National security · End date: Exempt under Section 24 - National security
  19. GROUND BASED AIR DEFENCE (GBAD) · Amber (NISTA's independent assessment) · End date: 31 December 2033
  20. JOINT CRYPT KEY PROGRAMME · Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters · End date: Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters
  21. LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS · Amber (NISTA's independent assessment) · End date: 31 December 2035
  22. LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR) · Amber (NISTA's independent assessment) · End date: 2 May 2033
  23. LIGHTNING PROGRAMME · Green (the department's own assessment) · End date: 31 March 2026
  24. MARSHALL · Red (the department's own assessment) · End date: 31 October 2026
  25. MECHANISED INFANTRY PROGRAMME · Amber (NISTA's independent assessment) · End date: 9 September 2033
  26. MENSA · Amber (NISTA's independent assessment) · End date: Exempt under Section 24 - National security
  27. MINE HUNTING CAPABILITY · Red (the department's own assessment) · End date: 31 March 2034
  28. Mobile Fires Platform · Amber (NISTA's independent assessment) · End date: Exempt under Section 43 - Commercial interests
  29. MODNET EVOLVE · Green (NISTA's independent assessment) · End date: 31 July 2026
  30. MULTI ROLE STRIKE SHIP · Red (the department's own assessment) · End date: 31 January 2040
  31. NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN) · Amber (the department's own assessment) · End date: 29 December 2029
  32. NEW MEDIUM HELICOPTER · Amber (the department's own assessment) · End date: 31 May 2037
  33. NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED · Red (NISTA's independent assessment) · End date: 31 March 2029
  34. NEXT GENERATION (FIXED) COMMUNICATION NETWORK · Red (NISTA's independent assessment) · End date: 25 March 2030
  35. PROTECTOR · Red (the department's own assessment) · End date: 30 June 2030
  36. SKYNET 6 (AKA FBLOS) · Red (NISTA's independent assessment) · End date: 31 December 2041
  37. SPEARCAP 3 · Red (the department's own assessment) · End date: 31 December 2047
  38. SPEARFISH UPGRADE PROGRAMME · Exempt under Section 24 - National security · End date: Exempt under Section 24 - National security
  39. SUBMARINE DISMANTLING PROJECT · Red (the department's own assessment) · End date: 31 October 2028
  40. SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE · Red (NISTA's independent assessment) · End date: 21 May 2031
  41. SUBMERSIBLE SHIP NUCLEAR AUKUS · Amber (NISTA's independent assessment) · End date: 30 April 2043
  42. TEUTATES · Exempt under Section 27 - International relations · End date: 1 July 2030
  43. TYPE 26 GLOBAL COMBAT SHIP PROGRAMME · Amber (the department's own assessment) · End date: 31 January 2037
  44. TYPE 31 · Red (NISTA's independent assessment) · End date: 31 July 2033
  45. A400M · Amber (the department's own assessment) · End date: 31 December 2028 · Last reported March 2025
  46. CROWSNEST PROGRAMME · Green (NISTA's independent assessment) · End date: 6 August 2025 · Last reported March 2025
  47. Maritime Electronic Warfare Programme · Amber (the department's own assessment) · End date: 29 October 2035 · Last reported March 2024
  48. MARTLET · Green (the department's own assessment) · End date: 19 December 2025 · Last reported March 2025
  49. METEOR · Amber (the department's own assessment) · End date: 31 December 2048 · Last reported March 2025
  50. Project Bramley · Exempt under Section 24 of the Freedom of Information Act 2000 (National security) · End date: Exempt under Section 24 of the Freedom of Information Act 2000 (National security) · Last reported March 2024
  51. SEA VENOM · Green (the department's own assessment) · End date: 21 December 2029 · Last reported March 2025

MOJ · 24

Department page: Ministry of Justice

  1. 10k Additional Prison Places - New Build · Amber (NISTA's independent assessment) · End date: 31 May 2032
  2. 10K Additional Prison Places Estate Expansion Category D · Red (NISTA's independent assessment) · End date: 20 March 2031
  3. 10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments · Red (NISTA's independent assessment) · End date: 5 February 2031
  4. Accelerated Houseblocks · Amber (NISTA's independent assessment) · End date: 1 November 2030
  5. Community Support Programme · Amber (the department's own assessment) · End date: 9 March 2029
  6. Decommission and Legacy Risk Migration (DLRM) · Amber (the department's own assessment) · End date: 30 September 2028
  7. Electronic Monitoring Expansion · Amber (NISTA's independent assessment) · End date: 15 June 2026
  8. Evolve: End User Computer Service (EUCS) · Green (the department's own assessment) · End date: 15 October 2026
  9. Evolve: Voice & Video · Green (the department's own assessment) · End date: 14 July 2028
  10. Evolve: WAN/LAN (Networks) · Green (the department's own assessment) · End date: 15 December 2028
  11. PFI Prison Expiry and Transfer Tranche 2 · Green (the department's own assessment) · End date: 31 July 2026
  12. PFI Prison Expiry and Transfer Tranche 3 · Amber (the department's own assessment) · End date: 31 July 2029
  13. Prisoner Education Services · Amber (the department's own assessment) · End date: 31 January 2027
  14. Property Transformation Programme · Amber (the department's own assessment) · End date: 30 September 2028
  15. Rapid Deployment Cells Project · Amber (NISTA's independent assessment) · End date: 31 July 2028
  16. Residential Property Tribunal · Amber (the department's own assessment) · End date: 31 March 2028
  17. Secure Children's Homes Commissioning · Green (the department's own assessment) · End date: 30 April 2026
  18. Small Secure Houseblocks · Amber (NISTA's independent assessment) · End date: 27 October 2028
  19. Drug Testing Services · Amber (the department's own assessment) · End date: 8 October 2025 · Last reported March 2025
  20. HMCTS Reform · Green (NISTA's independent assessment) · End date: 31 March 2025 · Last reported March 2025
  21. Print Recompete · Amber (the department's own assessment) · End date: 30 November 2024 · Last reported March 2024
  22. Prison Retail · Green (the department's own assessment) · End date: 30 June 2024 · Last reported March 2024
  23. Probation Workforce Reform · Green (the department's own assessment) · End date: 31 March 2025 · Last reported March 2024
  24. Secure School · Amber (NISTA's independent assessment) · End date: 1 October 2024 · Last reported March 2024

NCA · 2

  1. Concordis · Amber (the department's own assessment) · End date: Not given
  2. NCA Transformation Portfolio · Amber (NISTA's independent assessment) · End date: 31 March 2030 · Last reported March 2024

ONS · 3

  1. Census & Data Collection Transformation Programme · Green (NISTA's independent assessment) · End date: 31 March 2024 · Last reported March 2024
  2. Future Population and Migration Statistics (FPMS) Programme · Amber (the department's own assessment) · End date: 30 June 2025 · Last reported March 2025
  3. Integrated Data Programme (IDP) · Red (NISTA's independent assessment) · End date: 31 March 2026 · Last reported March 2025

VOA (Valuation Office Agency, reports to the Treasury) · 2

Department page: HM Treasury

  1. VOA NextGen Rating Programme · Amber (NISTA's independent assessment) · End date: 1 April 2030
  2. VOA Business Systems Transformation (BST) Council Tax · Amber (the department's own assessment) · End date: 30 June 2025 · Last reported March 2025

Sources: IPA Annual Report 2023-24; NISTA Annual Report 2024-25; NISTA Major Projects Annual Report 2025-26. Names, figures, dates and ratings are as the departments reported them. Where a rating, cost or date is withheld, the file’s wording is shown.